Skip to content
G

Guodong Lv

0009-0001-2130-2767

Publications (1)

Research on Construction Method of Reduced-order Model for Main Girder of Overhead Bridge Crane Based on Digital Twin

Guodong Lv, Bing Li, Leijing Yang & Yannan Liu · Journal of Engineering Research and Reports · 2026

To meet the high requirements for accuracy and real-time performance of main girder monitoring of overhead bridge cranes in digital twin systems, this paper studies the model order reduction technology combined with digital twin to realize the rapid analysis of the mechanical per...

Open access Research Article 10.9734/jerr/2026/v28i31832