Reservoir Management Structure A Field "RK" Using Water Injection Project Planning with the Suspended Well Reactivation Method
Dyah Rini R, MTH Kristianti, Edgie K, Richard Rama, Emi Sigalingging & Indar Parwa · Journal of Engineering Research and Reports · 2024
In reservoir management to increase oil production in structure A of the "RK" Field with an area of 98.12ft2, a thickness of 76,124 ft, a porosity of 0.21%, and an initial water saturation of 0.25% which already matches the high watercut, it is necessary to plan water injection...
Open access
Research Article
10.9734/jerr/2024/v26i81242