Application and Testing of a Laboratory Biotower Septic Tank System for Effluent Treatment - A Laboratory Study
Klaus Dölle & Simon Lex · Asian Journal of Advanced Research and Reports · 2022
A laboratory biotower septic tank system was designed, installed, started up with unfiltered wastewater during a 9-day start-up phase, and operated at a hydraulic retention time of 5-, 15-, and 20 days with filtered waste water and 5-, 10-, and 15 days for liquid cow manure. The...
Open access
Research Article
10.9734/ajarr/2022/v16i930494