Skip to content
Research Article Open access CC BY 4.0

Optimization Design of Transition Connection between Prestressed Lining and Steel-Concrete Composite Lining in High Water Pressure Tunnels

Chaoyang Zhu

Journal of Materials Science Research and Reviews · pp. 843–847 · Published 30 Nov 2023

Abstract

The Pearl River Delta Water Resources Allocation Project aims to solve the water conflict in this area and ensure the water use in water scarce areas and eastern Guangdong. The water conveyance tunnel project adopts a multi-layer lining structure to improve the bearing and deformation capacity of the structure due to its deep burial, high internal water pressure, and many cross domain areas. Due to the long distance and cross basin nature of the project, considering factors such as surrounding rock and external loads, multiple lining methods were chosen to achieve it, including steel concrete lining and prestressed lining.

Tunnel concrete construction

Cited by 0

No indexed citations yet.

Article metrics

Real usage data collected on this platform.

0

Page views

0

PDF downloads

0

Outbound clicks

0

Citations

Views by country

Approximate, from request IP at view time — not citizenship or institution. Countries with fewer than 5 views are grouped as "Other".

No views recorded yet.

Traffic sources

Referring site, by host.

No traffic recorded yet.

Views and downloads exclude known bots/crawlers. Citations combines this platform's own DOI-resolved index with each external source's own reported total — see Cited by above for individually listed citing works. Last refreshed 0 seconds ago.