An Application of Reliability-analysis Techniques in Project Management

Ali Muhammad Ali Rushdi, Alaa Mohammad Alturki

Journal of Advances in Mathematics and Computer Science · pp. 1–15 · Published 25 Apr 2017

10.9734/BJMCS/2017/33161

Abstract

This paper handles a prominent problem of project management, namely that of project scheduling under uncertainty. The paper models this problem as a vector-weighted voting system and expresses the indicator variable for the successful (on-time) completion of project activities as a vector-threshold Boolean function. The paper presents a solution of the problem in the Boolean domain using solely Boolean tools. The paper also presents another solution of the problem via recursive relations and boundary conditions. This solution is given as an insightful visual representation in terms of a signal-flow graph that resembles the Reduced-Ordered Binary Decision Diagram (ROBDD). The effect of the order of variables used in the recursive method is also explored.

Project management system reliability uncertain activities Vector-threshold Boolean model ROBDD-like signal flow graph.

Cited by 4

Article metrics

Real usage data collected on this platform.

0

Page views

0

PDF downloads

0

Outbound clicks

4

Citations

Views by country

Approximate, from request IP at view time — not citizenship or institution. Countries with fewer than 5 views are grouped as "Other".

No views recorded yet.

Traffic sources

Referring site, by host.

No traffic recorded yet.

Views and downloads exclude known bots/crawlers. Citations combines this platform's own DOI-resolved index with each external source's own reported total — see Cited by above for individually listed citing works. Last refreshed 0 seconds ago.